East Austin, Texas
Royal Basecamp’s inaugural project is a two-unit residential development in Austin, Texas, executed under the City’s updated land development code.
The project was structured to maximize site potential while maintaining disciplined underwriting and conservative execution assumptions. Through careful planning, legal structuring, and coordination across design, finance, and construction partners, the site was repositioned to support two independently sellable residences.
This project represents a full-cycle development process from origination through planned disposition.
Ground-up construction of two residential homes
Execution under updated land development code allowances
Creation and drafting of condominium regime documentation
Independent utility coordination and infrastructure planning
Market-positioned architectural and finish selections
The project required coordination across architectural design, civil considerations, legal documentation, financing structure, and builder execution.
The development is financed through a commercial construction loan structured with conservative underwriting assumptions.
Capital deployment, draw coordination, and cost oversight are actively managed throughout the build cycle to mitigate exposure and maintain liquidity discipline.
The financing structure was designed to support repeatable execution on future projects.
To enable two independently marketable residences on a single site, condominium regime documents were drafted and recorded in accordance with local requirements.
This required coordination across legal counsel, title, and survey to ensure proper unit delineation and compliance.
Leveraging the updated land development code created incremental density while remaining within regulatory bounds — enhancing site value without increasing footprint risk.
Site underwriting and acquisition
Architectural engagement and full plan development
Plan iteration aligned to buildability and resale positioning
Condominium documentation drafted and recorded
Commercial construction financing secured
Builder selection and contract alignment
Construction commencement
Active oversight continues through the construction phase with defined scope accountability and cost monitoring.
Acquisition & Planning: Completed
Financing Secured: Completed
Construction: In Progress
Scheduled Completion: Q1 2026
Target Listing: March 2026
This project reflects Royal Basecamp’s core operating framework:
Infrastructure-first evaluation
Conservative underwriting
Aligned builder incentives
Regulatory fluency
Resale durability lens